TxDOT Know Before You Go
  • On Monday, Jan 10, the right lane of the I-40 westbound frontage road will be closed from Lakeside Drive to Whitaker Road for milling hot mix.
  • Today through Thursday, Jan. 10 -13, the right lane of the I-40 eastbound frontage road will be closed from 2,000 feet before the Whitaker Road exit ramp to 1,000 feet past the exit ramp, for concrete pavement repairs.
  • On Tuesday, Jan. 11, the right lane of I-40 westbound will be closed from Lakeside Drive to Whitaker Road for hot mix overlay fromĀ  8 a.m. to 5 p.m.
  • On Wednesday, Jan. 12, the right lane and shoulder of I-40 eastbound will be closed from the entrance and exit ramps at Pullman Road. The left lane of the I-40 eastbound frontage road will also be closed. This is for concrete riprap placement at Pullman Road.
  • On Wednesday and Thursday, Jan. 12 and 13, from 8 a.m. to 5 p.m. each day the following will be closed for hot mix overlay:
    • The left lane of the I-40 westbound frontageĀ  road
    • The I-40 westbound exit ramp from Whitaker Road and the entrance ramp from Lakeside Drive
    • The I-40 westbound exit ramp to Whitaker Road and the entrance ramp to Lakeside Drive
  • The left lane of the I-40 eastbound frontage road will be closed from Ross Street to Nelson Street for slope repair.
  • The left lane of I-40 westbound will be closed at Arnot Road for bridge deck repairs.